Assessment & restoration of an old 19th-Centurybuilding to address structural hazards – Aubagne (13)

Réhabilitation

Diagnostic, Maîtrise d'œuvre,

Bois, Maçonnerie

Structural diagnoses, Project management,

Concrete, Masonry work

Assessment & restoration of an old 19th-Centurybuilding to address structural hazards – Aubagne (13)

AXIOLIS was commissioned to conduct a complete project management mission in the context of difficulties impacting the hazardous building at 21 Rue...

Structural diagnosis of floors and facades of the Hélio Marin Center in Vallauris.

Réhabilitation

Diagnostic,

Béton, Maçonnerie

Structural diagnoses,

Concrete

Structural diagnosis of floors and facades of the Hélio Marin Center in Vallauris.

The Hélio Marin Centre in Vallauris is a specialized rehabilitation center that specializes in the treatment of musculoskeletal and neurological...

Historic structure reconstruction Marseille’s downtown – Former post office building

Réhabilitation

Diagnostic, Exécution,

Béton

Structural diagnoses, Execution,

Concrete

Historic structure reconstruction Marseille’s downtown – Former post office building

The former Post Office building, located at 19 Henri Barbusse Street in Marseille's first district, was built in 1938 by architect Auguste Marie...

Structural Assessment on Listed Monument – Luxury Hermès Boutique in Paris

Réhabilitation

Diagnostic,

Béton

Structural diagnoses,

Concrete

Structural Assessment on Listed Monument – Luxury Hermès Boutique in Paris

The high-end Hermès store in Paris, which is located on the site of the former Lutetia swimming pool, was looking for a more elegant and warm...

Rehabilitation of a building in Marseille to ensure emergency exit safely

Réhabilitation

Diagnostic, Maîtrise d'œuvre, Exécution,

Bois, Maçonnerie

Structural diagnoses, Project management, Execution,

Concrete

Rehabilitation of a building in Marseille to ensure emergency exit safely

Affected by the serious and imminent danger and evacuated in December 2018, the building showed pathologies of disengagement in the rear adjoining...