Tous les projets d'Axiolis concernant :

Structural Engineering Consultancy - Région Sud / PACA

ingenieurie structure batiment architecture

Structural Engineering Consultancy - Région Sud / PACA

Assessment & restoration of an old 19th-Centurybuilding to address structural hazards – Aubagne (13)

Réhabilitation

Diagnostic, Maîtrise d'œuvre,

Bois, Maçonnerie

Structural diagnoses, Project management,

Concrete, Masonry work

Assessment & restoration of an old 19th-Centurybuilding to address structural hazards – Aubagne (13)

AXIOLIS was commissioned to conduct a complete project management mission in the context of difficulties impacting the hazardous building at 21 Rue...

Rehabilitation and extension of the nautical stadium in Antibes, Côte d’Azur Southern France

Réhabilitation

Maîtrise d'œuvre, Exécution,

Béton, Bois

Project management, Execution,

Rehabilitation and extension of the nautical stadium in Antibes, Côte d’Azur Southern France

The restructuring includes converting the diving pit into an Olympic-sized pool with 8 lanes (50m x 20m), renovating the existing Olympic pool,...

Diagnostic Stability of Eiffel-Type Metal Framework – Covered Market Hall of Beausoleil

Réhabilitation

Diagnostic Stability of Eiffel-Type Metal Framework – Covered Market Hall of Beausoleil

The Market Hall in the city of Beausoleil is a covered space with an area of 950 square meters, serving as the venue for the city's municipal...

Structural diagnosis of floors and facades of the Hélio Marin Center in Vallauris.

Réhabilitation

Diagnostic,

Béton, Maçonnerie

Structural diagnoses,

Concrete

Structural diagnosis of floors and facades of the Hélio Marin Center in Vallauris.

The Hélio Marin Centre in Vallauris is a specialized rehabilitation center that specializes in the treatment of musculoskeletal and neurological...

Rehabilitation of a building in Marseille to ensure emergency exit safely

Réhabilitation

Diagnostic, Maîtrise d'œuvre, Exécution,

Bois, Maçonnerie

Structural diagnoses, Project management, Execution,

Concrete

Rehabilitation of a building in Marseille to ensure emergency exit safely

Affected by the serious and imminent danger and evacuated in December 2018, the building showed pathologies of disengagement in the rear adjoining...